Lower Manair Dam Situated at Karimnagar District .LowerManairDam Works will started in1974 and ending of manair dam in 1985. In Manair Dam area at katiya Canal 146.00 km to 234 km. And Distributaries D 84 to D 94. And D.B.M 1 to D.B.M 29. Lower Manair Dam Water will goes up to 2,62,326 ac s.
| Catchment Area of River | 6,475 sqkm |
2500sq miles |
| Flood discharge(max)Observed | 9,910 cumecs |
3.50 lakhs cusec |
| Design discharge | 14,158 cumecs |
5.00 lakhs cusecs |
| Length of Earth dam | 10.10 kms |
33.156 ft |
| Max. Height of Earth dam | 26.822 mt |
88 ft |
| Top width of Earth dam | 7.315 mt |
24 ft |
| Full Reservoir Level | 280.416 mt |
+ 920.00 ft |
| Top level of Bund | +284.378mt |
+933.00 ft |
| Full Capacity of Reservoir | 0.68 Tm. Cumecs |
24.00 tm.cft |
| Water Spread area @+920.00 | 81.024 sq kmt |
31.284 m |
| No & Size of gates | 20 gates |
50 * 24 |